Fukushima nuclear power plant discharging final round of treated water for FY2025
2026-03-06 - 10:03
The operation, scheduled to run until March 24, will result in the release of about 7,800 tons of treated water containing tritium.
Share this post:
2026-03-06 - 10:03
The operation, scheduled to run until March 24, will result in the release of about 7,800 tons of treated water containing tritium.